SNo | Tender Subject | Tender ref | Publication Date | Cost Of Bid (RS) | Bid Doc.Sale period | Last Date For Bid Submission |
---|---|---|---|---|---|---|
GEM/2024/B/5624262 | 19.11.2024 | - | 19.11.2024 | 03.12.2024 | ||
GEM/2024/B/5559282 | 04.11.2024 | - | 04.11.2024 | 25.11.2024 | ||
GEM/2024/B/5578970 | 18.11.2024 | - | 18.11.2024 | 09.12.2024 | ||
GEM/2024/B/5572886 | 04.11.2024 | 50000 | 04.11.2024 | 25.11.2024 | ||
GEM/2024/B/5573598 | 05.11.2024 | - | 05.11.2024 | 26.11.2024 | ||
GEM/2024/B/5570023 | 04.11.2024 | 200000 | 04.11.2024 | 25.11.2024 | ||
GEM/2024/B/5575003 | 08.11.2024 | - | 08.11.2024 | 29.11.2024 | ||
Coal Transportation from North Chennai Thermal Power Station (NCTPS) to NTECL Coal Yard by Road Mode | GEM/2024/B/5584312 | 07.11.2024 | - | 07.11.2024 | 18.11.2024 | |
AMC for NTECL Township’s EPABX system (HIPATH 4000 & Access 500 A) | GEM/2024/B/5568694 | 02.11.2024 | - | 02.11.2024 | 16.11.2024 | |
Coal Transportation from Ennore Coal Terminal Pvt. Ltd. (ECTPL) to NTECL Coal Yard by Road Mode | GEM/2024/B/5552586 | 27.10.2024 | - | 27.10.2024 | 11.11.2024 | |
GEM/2024/B/5541199 | 24.10.2024 | - | 24.10.2024 | 14.11.2024 | ||
Hiring of Vehicles for Upper Bhawani Pump Storage Project for 2 Years. | GEM/2024/B/5502190 | 24.10.2024 | - | 24.10.2024 | 07-11-2024 | |
GEM/2024/B/5523895 | 19.10.2024 | - | 19.10.2024 | 02-11-2024 | ||
Construction of Concrete Roads in Athipattu Pudunagar under CSR Works. | NTECL/C&M/CS-5807 | 08.10.2024 | 2,250 | 08.10.2024 | 28.10.2024 | |
GEM/2024/B/5461395 | 08.10.2024 | - | 08.10.2024 | 18.10.2024 | ||
GEM/2024/B/5473693 | 05.10.2024 | - | 05.10.2024 | 26.10.2024 | ||
ENGAGING THIRD PARTY INSPECTION AGENCY FOR NTECL ORDERED ITEMS ANYWHERE IN INDIA | GEM/2024/B/5400175 | 30.09.2024 | - | 30.09.2024 | 21.10.2024 | |
GEM/2024/B/5437924 | 04.10.2024 | - | 04.10.2024 | 18.10.2024 | ||
GEM/2024/B/5412516 | 18.09.2024 | - | 09.10.2024 | 09.10.2024 | ||
GEM/2024/B/5337941 | 19.09.2024 | - | 19.09.2024 | 10.10.2024 | ||
NTECL/C&M/CS-5724 | 21.09.2024 | - | 21.09.2024 | 12.10.2024 | ||
NTECL/C&M/CS-5789 | 21.09.2024 | - | 21.09.2024 | 12.10.2024 | ||
Assessment and Review of Earthing & Lightning system of Plant Area, Switchyard & C&I System | GEM/2024/B/5388979 | 20.09.2024 | - | 20.09.2024 | 11.10.2024 | |
Anticorrosive Painting Structural Steel Members of FGD Gypsum area Building at NTECL | NTECL/C&M/CS-5758 | 17.09.2024 | - | 17.09.2024 | 08.10.2024 | |
Hiring of Advanced Life Support (ALS) & Basic Life Support (BLS) Ambulances with Manpower at NTECL. | GEM/2024/B/5401758 | 14.09.2024 | - | 14.09.2024 | 05.10.2024 | |
NTECL/C&M/CS-5759 | 06.09.2024 | - | 06.09.2024 | 16.09.2024 | ||
Conducting Information Technology Security Audit at NTECL, VTPS | GEM/2024/B/5328671 | 04.09.2024 | - | 04.09.2024 | 25.09.2024 | |
PROVIDING PATHOLOGY LAB TESTS & MANPOWER FACILITIES AT NTECL PHC TOWNSHIP VALLUR | GEM/2024/B/5354916 | 04.09.2024 | - | 04.09.2024 | 18.09.2024 | |
Supply & Installation of CCTV System at permanent store building of NTECL Vallur TP | GEM/2024/B/5341996 | 29.08.2024 | - | 29.08.2024 | 19.09.2024 | |
NTECL/C&M/CS-5782 | 28.08.2024 | - | 28.08.2024 | 11.09.2024 | ||
Service Contract for the Electrical wiring in D1/3(i.e., PHC) Quarters in NTECL Township | NTECL/C&M/CS-5749 | 23.08.2024 | - | 23.08.2024 | 13.09.2024 | |
NTECL/C&M/CS-5715 | 23.08.2024 | - | 23.08.2024 | 13.09.2024 | ||
Hiring of 2 Nos. 60 Ft (18M) & 1 No. 125Ft (38m) BOOM LIFT for 1 Year. | NTECL/C&M/CS-5717 | 16.08.2024 | - | 16.08.2024 | 06.09.2024 | |
GEM/2024/B/5294004 | 16.08.2024 | - | 16.08.2024 | 26.08.2024 | ||
NTECL/C&M/CS-5746 | 14.08.2024 | - | 14.08.2024 | 04.09.2024 | ||
GEM/2024/B/5270992 | 09.08.2024 | - | 09.08.2024 | 30.08.2024 | ||
GEM/2024/B/5235445 | 01.08.2024 | - | 01.08.2024 | 16.08.2024 | ||
NTECL/C&M/CS-5634 | 01.08.2024 | - | 01.08.2024 | 21.08.2024 | ||
NTECL/C&M/CS-5725 | 30.07.2024 | - | 30.07.2024 | 20.08.2024 | ||
NTECL/C&M/CS-5720 | 29.07.2024 | - | 29.07.2024 | 19.08.2024 | ||
NTECL/C&M/CS-5518 | 27.07.2024 | - | 27.07.2024 | 17.08.2024 | ||
Supply Installation and Commissioning of Chimney Aviation Light for Chimney 1&2 | GEM/2024/B/5216593 | 27.07.2024 | - | 27.07.2024 | 17.08.2024 | |
NTECL/C&M/CS-5708 | 26.07.2024 | - | 05.08.2024 | 05.08.2024 | ||
Proposal for O&M NDT Works Contract for RT, DPT, MPT, UT during Overhauling at NTECL Vallur | NTECL/C&M/CS-5750 | 26.07.2024 | - | 16.08.2024 | 16.08.2024 | |
CC Pavement Works at Ash Dyke Approach Roads, Ramps and Ash Silo Areas at NTECL Vallur | NTECL/C&M/CS-5707 | 16.07.2024 | Rs.2250.00 | 16.07.2024 | 05.08.2024 | |
Repair & Rehabilitation of Structurally Damaged Columns of Permanent Store Building at NTECL | GEM/2024/B/5159347 | 13.07.2024 | - | 13.07.2024 | 23.07.2024 | |
Biennial Maintenance Contract for Electrical Equipments in Township at NTECL Vallur | GEM/2024/B/5126833 | 04.07.2024 | - | 04.07.2024 | 25.07.2024 | |
GEM/2024/B/5106230 | 08.07.2024 | - | 08.07.2024 | 22.07.2024 | ||
Operation and Maintenance of NTECL Pipe Conveyor for the period 2024-2026 | GEM/2024/B/5053522 | 29.06.2024 | - | 29.06.2024 | 20.07.2024 | |
GEM/2024/B/5093497 | 03.07.2024 | - | 03.07.2024 | 13.07.2024 | ||
GEM/2024/B/4920752 | 15.06.2024 | - | 15.06.2024 | 06.07.2024 | ||
FACILITY MANAGEMENT SERVICES FOR SOFTWARE AND NETWORK RELATED WORKS AT NTECL VALLUR TPP | GEM/2024/B/5108786 | 29.06.2024 | - | 29.06.2024 | 20.07.2024 | |
Servicing/Refurbishment of Boiler Main steam Stop Valves and other HP valves | GEM/2024/B/5057053 | 29.06.2024 | - | 29.06.2024 | 13.07.2024 | |
GEM/2024/B/5074442 | 21.06.2024 | - | 21.06.2024 | 12.07.2024 | ||
GEM/2024/B/4935052 | 31.05.2024 | - | 31.05.2024 | 21.06.2024 | ||
OPERATION & MAINTENANCE OF FGD SYSTEM OF UNIT#1 IN NTECL VALLUR | NTECL/C&M/CS-5688 | 31.05.2024 | - | 31.05.2024 | 21.06.2024 | |
NTECL/C&M/CS-5595 | 25.05.2024 | - | 31.05.2024 | 14.06.2024 | ||
GEM/2024/B/4942641 | 25.05.2024 | - | 25.05.2024 | 10.06.2024 | ||
GEM/2024/B/4974610 | 23.05.2024 | - | 23.05.2024 | 03.06.2024 | ||
GEM/2024/B/4927139 | 22.05.2024 | Rs. 50,000/- | 22.05.2024 | 12.06.2024 | ||
GEM/2024/B/4929766 | 14.05.2024 | - | 14.05.2024 | 28.05.2024 | ||
NTECL/C&M/CS-5637 | 13.05.2024 | Rs 1125/- | 13.05.2024 | 24.05.2024 | ||
OPTICAL FIBRE AND TELEPHONE CABLE MAINTENANCE AT NTECL VALLUR TPP | GEM/2024/B/4880912 | 29.04.2024 | - | 29.04.2024 | 20.05.2024 | |
GEM/2024/B/4847954 | 26.04.2024 | - | 17.05.2024 | 17.05.2024 | ||
PERFORMANCE TESTING AND CONSULTANCY FOR IMPROVING COOLING TOWER (CT) PERFORMANCE AT NTECL VALLUR | GEM/2024/B/4860328 | 22.04.2024 | - | 22.04.2024 | 06.05.2024 | |
GEM/2024/B/4858620 | 12.04.2024 | - | 12.04.2024 | 27.04.2024 | ||
PROCUREMENT OF TWO NOS.OCEMS STATIONS FOR SEWAGE TREATMENT PLANT | GEM/2024/B/4726085 | 03.04.2024 | - | 03.04.2024 | 24.04.2024 | |
GEM/2024/B/4775895 | 29.03.2024 | - | 29.03.2024 | 19.04.2024 | ||
GEM/2024/B/4822007 | 28.03.2024 | - | 28.03.2024 | 25.04.2024 | ||
GEM/2024/B/4535093 | 15.03.2024 | - | 15.03.2024 | 03.04.2024 | ||
NTECL/C&M/CS-5622 | 04.03.2024 | - | 04.03.2024 | 23.03.2024 | ||
NTECL/C&M/CS-5299 | 04.03.2024 | - | 04.03.2024 | 23.03.2024 | ||
TRANSPORTATION AND DISTRIBUTING DRINKING WATER CANS AT NTECL PLANT PREMISES AND TOWNSHIP | NTECL/C&M/CS-5567 | 04.03.2024 | - | 04.03.2024 | 16.03.2024 | |
NTECL/C&M/CS-5335 | 04.03.2024 | - | 04.03.2024 | 23.03.2024 | ||
GEM/2024/B/4508624 | 26.02.2024 | - | 26.02.2024 | 19.03.2024 | ||
TRIENNIAL MECHANICAL MAINTENANCE (MEGA) CONTRACT FOR OFFSITE AREAS | NTECL/C&M/OT/CS-5342R | 06.02.2024 | - | 06.02.2024 | 04.03.2024 | |
GEM/2024/B/4619322 | 13.02.2024 | - | 13.02.2024 | 23.02.2024 | ||
Providing Water Proofing Services in NTECL Township - Vallur | GEM/2024/B/4541593 | 12.02.2024 | - | 12.02.2024 | 02.03.2024 | |
GEM/202/B/4558985 | 07.02.2024 | - | 07.02.2024 | 28.02.2024 | ||
TRANSPORTATION OF HEAVY / ODC TG COMPONENTS FROM/TO NTECL FOR UNIT # 1 RESTORATION WORKS | GEM/2024/B/4525465 | 06.02.2024 | - | 06.02.2024 | 20.02.2024 | |
TRIENNIAL MECHANICAL MAINTENANCE (MEGA) CONTRACT FOR OFFSITE AREAS | GEM/2024/B/4591894 | 06.02.2024 | - | 06.02.2024 | 04.03.2024 | |
GEM/2023/B4446702 | 23.01.2024 | - | 23.01.2024 | 08/02/2024 | ||
Supply, Installation, Commissioning and CAMC of AAQMS System | NTECL/C&M/ICB/CS-5534 | 09.01.2024 | Rs.2,250/- | 09.01.2024 | 31.01.2024 | |
GEM/2024/B/4434079 | 14.11.2023 | NIL | 21.10.2023 | 29.01.2024 | ||
Biennial Contract of Civil Maintenance & Pest Control works at NTECL Township Department | GEM/2023/B/4416365 | 06.01.2024 | NIL | 06.01.2024 | 27.01.2024 | |
GEM/2023/B/4412981 | 06.01.2024 | NIL | 06.01.2024 | 27.01.2024 | ||
GEM/2023/B/4368023 | 19.12.2023 | NIL | 09.01.2024 | 09.01.2024 | ||
GEM/2023/B/4341917 | 16.12.2023 | NIL | 05.01.2024 | 05.01.2024 | ||
TRANSPORTATION OF HEAVY / ODC TG COMPONENTS FROM/TO NTECL FOR UNIT 1 RESTORATION WORKS. | NTECL/C&M/CS-5552 | 29.11.2023 | NIL | 29.11.2023 | 06.12.2023 | |
GEM/2023/B/4277522 | 01.12.2023 | NIL | 01.12.2023 | 22.12.2023 | ||
PROCUREMENT OF 0.301 MMT IMPORTED COAL OF ORIGIN OTHER THAN INDIA FOR NTECL VALLUR TPP |
NTECL/C&M/ICB/CS-5548 | 28.11.2023 | NIL | 28.11.2023 | 19.12.2023 | |
GEM/2023/B/4238585 | 22.11.2023 | NIL | 22.11.2023 | 02.12.2023 | ||
GEM/2023/B/4214201 | 17.11.2023 | NIL | 17.11.2023 | 08.12.2023 | ||
Supply and Application of Anti Corrosive Painting in Main Plant /Offsite/CHP Areas of Vallur TPP |
GEM/2023/B/4223711 | 17.11.2023 | NIL | 17.11.2023 | 09.12.2023 | |
COAL TRANSPORTATION FROM NCTPS /ECTPL TO NTECL COAL YARD BY ROAD |
GEM/2023/B/4213846 | 17.11.2023 | NIL | 17.11.2023 | 24.11.2023 | |
GEM/2023/B/4201022 | 20.10.2023 | NIL | 20.10.2023 | 27.11.2023 | ||
Civil RCC Pedestals supports for GRP line from CW forebay inlet line to RO plant |
GEM/2023/B/B/4155923 | 04.11.2023 | NIL | 04.11.2023 | 20.11.2023 | |
GEM/2023/B/4095810 | 14.11.2023 | - | 18.11.2023 | 18.11.2023 | ||
Supply and Installation of High Efficiency Drift Eliminators |
GEM/2023/B/4151520 | 31.10.2023 | - | 31.10.2023 | 21.11.2023 | |
GEM/2023/B/4137366 | 27.10.2023 | - | 27.10.2023 | 17.11.2023 | ||
GEM/2023/B/4112657 | 20.10.2023 | - | 20.10.2023 | 30.10.2023 | ||
GEM/2023/B/4068559 | 14.10.2023 | - | 14.10.2023 | 21.10.2023 | ||
Development & Implementation of Integrated Management System of ISO 9001, 14001 & 45001 |
GEM/2023/B/4051616 | 13.10.2023 | - | - | 03-11-2023 | |
O&M WORKS OF COAL HANDLING PLANT AT NTECL VALLUR THERMAL POWER PROJECT (2X500MW + 1x500 MW) |
GEM/2023/B/3943102 | 25.09.2023 | - | 25.09.2023 | 16.10.2023 | |
Rehabilitation of Rail Track for Stacker Reclaimer at NTECL. |
NTECL/C&M/CS-5203 | 28.09.2023 | 1,00,000.00/- | 21.10.2023 | 21.10.2023 | |
Biennial Maintenance Contract for Civil Housekeeping services at NTECL. |
NTECL/C&M/CS-5427 | 28.09.2023 | 2,00,000.00/- | 18.10.2023 | 18.10.2023 | |
Restoration of Corroded Staircases and Structures in TP-9 to 12 of CHP. |
GEM/2023/B/3970050 | 28.09.2023 | - | 28.09.2023 | 19.10.2023 | |
GEM/2023/B/3985073 | 28.09.2023 | - | 28.09.2023 | 19.10.2023 | ||
NTECL/C&M/CS-5447 | 31.07.2023 | 4500.00/- | 31.07.2023 | 05.10.2023 | ||
THREE YEAR MEGA CONTRACT FOR ELECTRICAL AND C&I MAINTENANCE AT NTECL VALLUE 3X500 MW (RETENDER) |
NTECL/C&M/CS-5331 | 06.09.2023 | 50,00,000.00/- | 06.09.2023 | 27.09.2023 | |
NTECL/C&M/OT/CS-5402 | 06.09.2023 | 50,00,000.00/- | 06.09.2023 | 27.09.2023 | ||
NTECL/C&M/CS-5470 | 06.09.2023 | NILL | 06.09.2023 | 26.09.2023 | ||
NTECL/C&M/CS-5435 | 04.09.2023 | NILL | 04.09.2023 | 29.09.2023 | ||
NTECL/C&M/CS-5467 | 24-08-2023 | NILL | 24-08-2023 | 21.09.2023 | ||
NTECL/C&M/CS-5313 | 24.08.2023 | 2000000.00/- | 24.08.2023 | 13.09.2023 | ||
NTECL/C&M/CS-5447 | 31.07.2023 | 4500/- | 31.07.2023 | 16.08.2023 | ||
Biennial Maintenance Contract for Civil Housekeeping services at NTECL |
NTECL/C&M/CS-5427 | 26.07.2023 | 2250/- | 26.07.2023 | 14.08.2023 | |
NTECL/C&M/CS-5429(R) | 27.07.2023 | 3,375/- | 27.07.2023 | 01.08.2023 | ||
Restoration of Corroded Staircases and Structures in TP-9 to TP-12 of CHP |
NTECL/C&M/CS-5419 | 24.07.2023 | 2250/- | 24.07.2023 | 14.08.2023 | |
NTECL/C&M/CS-5323 | 25.07.2023 | 1125/- | 25.07.2023 | 15.08.2023 | ||
NTECL/C&M/CS-5429 | 08.07.2023 | 3,375/- | 08.07.2023 | 22.07.2023 | ||
Rehabilitation of Rail Track for Stacker / Reclaimer at NTECL |
NTECL/C&M/CS-5203 | 05.07.2023 | 1125/- | 05.07.2023 | 26.07.2023 | |
Supply and application of RTV silicone high voltage insulator coating in 400 KV Switchyard |
NTECL/C&M/CS-4805 | 05.07.2023 | 1125/- | 05.07.2023 | 26.07.2023 | |
NTECL/C&M/CS-5416 | 20.06.2023 | 2,250/- | 20.06.2023 | 11.07.2023 | ||
Providing IT infrastructure at upcoming Admin. Building and Permanent Stores |
NTECL/C&M/CS-4980 | 03.06.2023 @ 1850 Hrs | 1125/- | 12.06.2023 @ 1705 Hrs | 26.06.2023 @ 1430 Hrs | |
NTECL/C&M/CS-5380 | 05.06.2023 @ 1045 Hrs | 4500/- | 15.06.2023 @ 1805 Hrs | 26.06.2023 @ 1800 Hrs | ||
NTECL/C&M/CS-5371 | 10.05.2023 | 2250/- | 10.05.2023 | 01.06.2023 | ||
NTECL/C&M/CS-4976 | 31.03.2023 | 2250/- | 31.03.2023 | 27.04.2023 | ||
2023_NTECL_145306_2 | 13.02.2023 | 1125/- | 23.03.2023 | 06.04.2023 | ||
Biennial Contract for Civil Works in Internal CHP at NTECL and External CHP at NCTPS and KPL |
NTECL/C&M/CS-5309 | 22.03.2023 | 2250/- | 22.03.2023 | 11.04.2023 | |
Repair and Rehabilitation Works at Desalination Plant & Allied Structures |
NTECL/C&M/CS-5326 | 20.03.2023 | 2250/- | 20.03.2023 | 10.04.2023 | |
NTECL/C&M/CS-5345 | 10.03.2023 | 4500/- | 10.03.2023 | 30.03.2023 | ||
Replacement of Roofing & Cladding Sheets For Various Buildings At Ntecl. |
NTECL/CS-5242 | 04.03.2023 | 3375/- | 04.03.2023 | 18.03.2023 | |
NTECL/CS-5129 | 22.02.2023 | 2250/- | 22.02.2023 | 13.03.2023 | ||
NTECL/C&M/OT/CS-5315 | 13.02.2023 | 1125/- | 13.02.2023 | 27.02.2023 | ||
DEVELOPMENT OF PARKING AREA FOR ASH BULKERS OUTSIDE KONDAKKARAI GATE |
CS 5201 | 11.02.2023 | 2250/- | 11.02.2023 | 04.03.2023 | |
NTECL/CS-5270 | 08.02.2023 | 11250/- | 08.02.2023 | 08.03.2023 | ||
NTECL/CS-5240 | 06.02.2023 | 2250/- | 06.02.2023 | 27.02.2023 | ||
NTECL/CS-5082 | 23.01.2023 | 2250/- | 23.01.2023 | 11.02.2023 | ||
Providing & Fixing concertina fencing for township boundary wall in NTECL township |
2023_NTECL_142301_1 | 20.01.23 | 900/- | 21.01.23 | 20.02.2023 | |
2023_NTECL_141155_1 | 11.01.23 | 2250.00 | 11.01.23 | 24.01.2023 | ||
EXPRESSION OF INTEREST (EOI) FOR SUPPLY OF BIOMASS PELLETS TO NTECL. |
Detailed Notice EOI 2022_23 EOI | 30.12.2022 | NIL | 30.12.2022 | 31.01.2023 | |
NTECL/C&M/OT/CS-5226 | 15.12.2022 | Rs.1125/- | 15.12.2022 | 06.01.2023 | ||
Dismantling/Fabrication/Erection of corroded structures of Pipe/ Cable Trestles in Boiler/FOPH areas |
NTECL/C&M/CS-5237 | 05.12.2022 | Rs.1125/- | 05.12.2022 | 29.12.2022 | |
Application/ repair of PU coating in sea water pipelines during unit overhauling |
2022_NTECL_135034_1 | 10.11.2022 | Rs.2250.00/- | 24.11.2022 | 24.11.2022 | |
2022_NTECL_134885_1 | 09.11.2022 | Rs.1125.00/- | 25.11.2022 | 25.11.2022 | ||
Design, Supply & Installation of Mixed resin storage vessel at CPU regeneration plant |
2022_NTECL_132828_1 | 26.10.2022 | Rs.1125.00/- | 17.10.2022 | 17.10.2022 | |
NTECL/C&M/CS-5171 | 27.09.2022 | Rs.22,500/- | From 27.09.2022 | 18.10.2022 | ||
NTECL/C&M/CS-4976 | 27.09.2022 | Rs.2250/- | 27.09.2022 | 25.10.2022 | ||
Corrigendum Date extension - Repair works of Fire Water Tanks |
NTECL/C&M/OT/CS-5156 | 16.09.2022 | Rs.1125/- | 16.09.2022 | 27.09.2022 | |
Corrigendum for Clarification - Repair works of Fire Water Tanks |
NTECL/C&M/OT/CS-5156 | 16.09.2022 | Rs.1125/- | 16.09.2022 | 27.09.2022 | |
Biennial Maintenance Contract for LT and HT Motors of Main Plant & Offsites |
NTECL/C&M/CS-5110 | 09.09.2022 | Rs.2250/- | 09.09.2022 | 06.10.2022 | |
NTECL/C&M/OT/CS-5185 | 10.09.2022 | Rs.1125/- | 10.09.2022 | 03.10.2022 | ||
Application/ repair of PU coating in sea water pipelines during unit overhauling |
NTECL/C&M/OT/CS-5157 | 06.09.2022 | Rs.2250/- | 06.09.2022 | 03.10.2022 | |
Replacement of Rusted/Damaged Fire Water Pipelines in Offsite Areas of NTECL |
NTECL/C&M/OT/CS-5042 | 07.09.2022 | Rs.1125/- | 07.09.2022 | 27.09.2022 | |
Biennial Maintenance Contract for Civil Works at NTECL's VTPP (Excluding CHP area) |
2022_NTECL_126242_1 | 19.08.2022 | Rs.2373/- | 02.09.2022 | 09.09.2022 | |
NTECL/C&M/CS-5070 | 29.08.2022 | Rs.1125/- | 29.08.2022 | 10.09.2022 | ||
2022_NTECL_127059_1 | 27.08.2022 | Rs.1125/- | 16.09.2022 | 16.09.2022 | ||
NTECL/C&M/OT/CS-4974 | 24.08.2022 | Rs.1125/- | From 24.08.2022 | 13.09.2022 | ||
Design, Supply & Installation of Mixed resin storage vessel at CPU regeneration plant |
NTECL/C&M/CS-5055 | 23.08.2022 | Rs.1125/- | 23.08.2022 | 27.09.2022 | |
Biennial Maintenance Contract for Civil Works at NTECL VTPP (Excluding CHP area) |
2022_NTECL_126242_1 | 19.08.2022 | Rs.2373/- | 02.09.2022 | 02.09.2022 | |
SUPPLY & APPLICATION OF ANTI-CORROSIVE PAINTING IN CHP, MAIN PLANT & OFF-SITE AREA. |
2022_NTECL_123199_2 | 02.08.2022 | Rs.7875/- | 08.08.2022 | 08.08.2022 | |
2022_NTECL_121637_1 | 07.07.2022 | Rs.2250/- | 28.07.2022 | 28.07.2022 | ||
Biennial Maintenance contract for Lighting,Hoist, Crane and cabling work at NTECL |
NTECL/C&M/OT/CS-4977 | 28.06.2022 | Rs.2250/- | From 28.06.2022 | 16.07.2022 | |
2022_NTECL_118789_1 | 11.05.2022 | As per e-bid | 25.06.2022 | 25.06.2022 | ||
2022_NTECL_113604_1 | 21.04.2022 | As in e-bid | 21.04.2022,6.50 PM | 05.05.2022,02.30 PM | ||
NTECL/C&M/OT/CS-5013 | 09.04.2022 | 2250/- | From 09.04.2022 | 23.04.2022 | ||
Biennial Maintenance Contract for Conveyors,Equipment&Auxiliaries in CHP |
NTECL/C&M/OT/CS-5022 | 09.04.2022 | 3375/- | As in e-bid | As in e-bid | |
Biennial Maintenance Contract for Civil Works at NTECL’s VTPP (Excluding CHP area) |
NTECL/C&M/OT/CS-4965 | 19.03.2022 | 2373/- | From 19.03.2022 | 09.04.2022 | |
NTECL/C&M/OT/CS-4962 | 17.03.2022 | 2373/- | From 17.03.2022 | 05.04.2022 | ||
NTECL/C&M/CS-5008 | 10.03.2022 | 7875/- | From 10.03.2022 | 24.03.2022 | ||
Hiring of 32 Seater Ac Bus For School Going children At NTECL |
NTECL/C&M/OT/CS-5004 | 11.03.2022 | 1125/- | From 11.03.2022 | 31.03.2022 | |
NTECL/C&M/OT/CS-5002 | 25.02.2022 | 1125/- | From 25.02.2022 | 11.03.2022 | ||
NTECL/C&M/CS-4884 | 02.02.2022 | Free of cost | From 02.02.2022 | 19.02.2022 | ||
NTECL/C&M/CS-4973 | 25.01.2022 | Nil | From 28.01.2022 | 17.02.2022 | ||
NTECL/C&M/CS-4973 | 25.01.2022 | Nil | From 28.01.2022 | 17.02.2022 | ||
NTECL/C&M/OT/CS-4920 | 04.01.2022 | Nil | From 04.01.2022 | 20.01.2022 | ||
Biennial maintenance contract for fire detection & protection system at NTECL |
NTECL/C&M/OT/CS-4948 | 31.12.2021 | Nil | From 31.12.2021 | 17.01.2022 | |
NTECL/C&M/OT/CS-4905 | 07.12.2021 | Nil | 08.12.2021 | 28.12.2021 | ||
NTECL/C&M/CS-4930 | 11.12.2021 | Nil | From 11.12.2021 | 21.12.2021 | ||
Cathodic Protection of NTECL MUW and ETP underground Pipeline sections at NCTPS area |
NTECL/C&M/OT/CS-4762 | 25.11.2021 | Nil | From 25.11.2021 | 16.12.2021 | |
Biennial Maintenance Contract for Turbine & Auxiliaries for FY 2022-24 |
NTECL/C&M/OT/CS-4918 | 30.11.2021 | Nil | From 30.11.2021 | 18.12.2021 | |
CONTRACT FOR REPLACEMENT OF 700NB SEA WATER MAKEUP LINE WITH GRP PIPING |
NTECL/C&M/OT/CS-4898 | 30.11.2021 | Nil | From 30.11.2021 | 28.12.2021 | |
NTECL/C&M/OT/CS-4901 | 27.11.2021 | Nil | From 27.11.2021 | 13.12.2021 | ||
Maintenance Contract for Insulation & Refractory Works in NTECL |
NTECL/C&M/CS-4849 | 27.11.2021 | Nil | 16.12.2021 | ||
NTECL/C&M/OT/CS-4690 | 16.11.2021 | Nil | From 16.11.2021 | 08.12.2021 | ||
NTECL/C&M/OT/CS-4845 | 03.11.2021 | Nil | From 03.11.2021 | 01.12.2021 | ||
NTECL/C&M/CS-4765 (R) | 03.11.2021 | Nil | From 03.11.2021 | 08.11.2021 | ||
NTECL/C&M/OT/CS- 4877 | 01.11.2021 | Nil | From 01.11.2021 | 20.11.2021 | ||
Biennial Maintenance Contract for Milling System, Fans and APHs at NTECL |
NTECL/C&M/OT/CS- 4838 | 02.11.2021 | Nil | From 02.11.2021 | 27.11.2021 | |
Contract for supply and installation of high efficiency Drift eliminators in cooling towers |
NTECL/C&M/OT/CS- 4772 | 19.10.2021 | Nil | From 19.10.2021 | 16.11.2021 | |
Biennial Maintenance Contract for Civil Works at NTECL’s Ash Dyke |
NTECL/C&M/OT/CS- 4857 | 09.10.2021 | Nil | From 09.10.2021 | 28.10.2021 | |
Annual Maintenance Contract for Civil Works in NTECL Township |
NTECL/C&M/OT/CS- 4843 | 28.09.2021 | Nil | From 29.09.2021 | 18.10.2021 | |
NTECL/C&M/CS-4765 | 25.09.2021 | Nil | From 25.09.2021 | 08.10.2021 | ||
NTECL/C&M/OT/CS-4817 | 23.09.2021 | Nil | From 23.09.2021 | 07.10.2021 | ||
Annual Maintenance Contract for Internal & External CHP Electrical |
NTECL/C&M/OT/CS-4861 | 25.09.2021 | Nil | From 25.09.2021 | 14.10.2021 | |
Biennial Contract for Jungle clearance and monsoon preparation works at NTECL |
NTECL/C&M/OT/CS- 4842 | 14.09.2021 | Nil | From 14.09.2021 | 29.09.2021 | |
Biennial Maintenance contract forHT/LT Switchgear in Main plant and Offsites |
NTECL/C&M/OT/CS-4821 | 27.08.2021 | Nil | From 27.08.2021 | 14.09.2021 | |
NTECL/C&M/OT/CS-4702 | 19.08.2021 | Nil | From 20.08.2021 | 13.09.2021 | ||
NTECL/C&M/OT/CS-4824 | 11.08.2021 | Nil | From 11.08.2021 | 30.08.2021 | ||
Annual Maintenance Contract for Ash slurry disposal lines and Ash pond management of NTECL |
NTECL/C&M/OT/CS-4740 | 03.08.2021 | Nil | From 03.08.2021 | 14.08.2021 | |
NTECL/C&M/CS-4758 | 08.05.2021 | Nil | From 09.08.2021 | 09.08.2021 | ||
Corrigendum-1 Invitation for allotment of shops at NTECl Township |
NTECL/HR/ES/SHOP/EOI/2021 | 14.07.2021 | Nil | From 14.07.2021 | 31.07.2021 | |
NTECL/C&M/OT/CS-4803 | 14.07.2021 | Nil | From 14.07.2021 | 29.07.2021 | ||
Restoration Of Corroded High Rise Transfer Points & Staircases in Chp Area |
NTECL/C&M/OT/CS-4807 | 07.07.2021 | Nil | From 08.07.2021 | 05.08.2021 | |
Procurement of Complete Assemblies of 2200 MM Butterfly Valves for CW System |
GEM/2021/B/1257572 | 28.06.2021 | Nil | From 28.06.2021 | 17.07.2021 | |
Annual Maintenance Contract for Ash slurry disposal lines and Ash pond management of NTECL |
NTECL/C&M/OT/CS-4740 | 02.07.2021 | Nil | From 02.07.2021 | 22.07.2021 | |
NTECL/HR/ES/SHOP/EOI-2021 | 29.06.2021 | Nil | From 29.06.2021 | 15.07.2021 | ||
Supply & Application of high grade anti-corrosive painting for high rise structures of BCN-8A/B |
NTECL/C&M/OT/CS-4766 | 19.06.2021 | Nil | From 19.06.2021 | 09.07.2021 | |
Annual Maintenance contract for LT &HT Motors of Main Plant &Offsites |
NTECL/C&M/OT/CS-4711 | 31.05.2021 | Nil | From 31.05.2021 | 14.06.2021 | |
NTECL/C&M/CS-4758 | 10.06.2021 | Nil | From 07.06.2021 | 17.06.2021 | ||
Fabrication and Erection of Steel structures in Boiler / FOPH areas |
NTECL/C&M/OT/CS-4769 | 07.06.2021 | Nil | From 07.06.2021 | 24.06.2021 | |
NTECL/C&M/CS-4758 | 08.05.2021 | Free of cost | From 08.05.2021 | 27.05.2021 | ||
Annual Maintenance contract for Lighting, Hoist & Cranes and cabling work at NTECL |
NTECL/C&M/OT/CS-4697 | 10.05.2021 | Nil | From 10.05.2021 | 22.05.2021 | |
Annual Maintenance Contract in Offsite areas at NTECL (2021-22) |
NTECL/C&M/OT/CS-4722 | 07.05.2021 | Nil | From 07.05.2021 | 19.05.2021 | |
Fabrication and erection of steel structures in Offsite areas |
NTECL/C&M/OT/CS-4718 | 22.04.2021 | Nil | From 22.04.2021 | 06.05.2021 | |
Providing and laying HDPE pipeline for water supply to Township from NTECL |
NTECL/C&M/OT/CS-4685 | 21.04.2021 | Nil | From 21.04.2021 | 15.05.2021 | |
Annual rate contract for rewinding & repair works of LT Motors and Control Transformers of NTECL |
NTECL/C&M/OT/CS-4565 | 01.04.2021 | Nil | From 01.04.2021 | 24.04.2021 | |
GEM/2021/B/1153861 | 10.04.2021 | - | 23.04.2021 | As per Bid | ||
NTECL/C&M/OT/CS- 4679 | 08.04.2021 | Nil/- | From 09.04.2021 | 01.05.2021 | ||
NTECL/C&M/OT/CS- 4635 | 07.04.2021 | Nil/- | From 08.04.2021 | 27.04.2021 | ||
GEM/2021/B/1080837 | 27.02.2021 | - | As per Bid | As per Bid | ||
NTECL/C&M/2020-21/Enlistment | 02.02.2021 | Nil/- | - | 16.03.2021 | ||
NTECL/C&M/CS-4671 | 20.02.2021 | Nil/- | - | 27.02.2021 | ||
NTECL/C&M/CS-4671 | 24.02.2021 | Nil/- | - | - | ||
NTECL/C&M/OT/CS-4669 | 15.02.2021 | Nil/- | From 15.02.2021 | 02.03.2021 | ||
Annual Maintenance Contract for Conveyors, Equipment & Auxiliaries in CHP |
NTECL/C&M/OT/CS-4544 | 15.02.2021 | Nil/- | From 15.02.2021 | 04.03.2021 | |
NTECL/C&M/2020-21/Enlistment | 02.02.2021 | Nil/- | - | - | ||
Annual Job Contract for Electrical Maintenance in NTECL Township |
NTECL/C&M/OT/CS-4627 | 03.02.2021 | Nil/- | From 03.02.2021 | 22.02.2021 | |
NTECL/C&M/OT/CS-4671 | 08.02.2021 | Nil/- | From 08.02.2021 | 20.02.2021 | ||
NTECL/C&M/OT/CS-4643 | 06.02.2021 | Nil/- | From 06.02.2021 | 13.02.2021 | ||
NTECL/C&M/OT/CS-4610 | 04.02.2021 | Nil/- | As per bid | As per bid | ||
Retrofitting of 100kW & above critical drive SFU Contactor LT modules with air circuit breakers |
Corrigendum CS-4301 | 03.02.2021 | As per Bid | From 04.02.2021 | As per Bid | |
Hiring of NON-AC Bus (33 Seater and 50 Seater) at NTECL for a period of 2 years |
Corrigendum /1-CS-4508 | 16.01.2021 | As per Bid | As per Bid | 08.02.2021 | |
NTECL/C&M/OT/CS-4628 | 30.01.2021 | NIL | From 30.01.2021 | 06.02.2021 | ||
Corrigendum 2020E3001 | As per Bid | NIL | As per Bid | 06.02.2021 | ||
NTECL/C&M/OT/CS-4616 | 01.02.2021 | Nil/- | From 01.02.2021 | 09.02.2021 | ||
CORRIGENDUM-1 HIRING OF NON-AC BUS (33 SEATER & 50 SEATER) AT NTECL FOR A PERIOD OF 02 YEARS |
NTECL/C&M/OT/CS-4508 | 16.01.2021 | Nil/- | - | 08.02.2021 | |
NTECL/C&M/OT/CS-4610 | 20.01.2021 | Nil/- | From 20.01.2021 | 06.02.2021 | ||
NTECL/C&M/CS-4301 | 16.01.2021 | Nil/- | - | - | ||
NTECL/C&M/OT/CS-4628 | 11.01.2021 | Nil/- | From 11.01.2021 | 23.01.2021 | ||
Hiring of Non AC Bus ( 33 seater & 50 seater) at NTECL for a period of 02 years |
NTECL/C&M/OT/CS-4508 | 16.01.2021 | Nil/- | 16.01.2021 | 01.02.2021 | |
NTECL/C&M/OT/CS-4643 | 13.01.2021 | Nil/- | From 13.01.2021 | 28.01.2021 | ||
Ref 2000E30239 | 07.10.2020 | 2373/- | 13.01.2021 | 03.02.2021 | ||
Ref 2020E30001 | 04.12.2020 | 2373/- | 13.01.2021 | 01.02.2021 | ||
NTECL/C&M/OT/CS-4616 | 07.01.2021 | NIL | From 07.01.2021 | 21.01.2021 | ||
Retrofitting of 100kW & above critical drive SFU contractor LT modules with air circuit breakers |
NTECL/C&M/OT/CS-4301 | 04.12.2020 | NIL | From 04.12.2020 | 22.12.2020 | |
Single Stag Two Envelope Bidding for procurement of Cement(opc) for civil Works Of VTPP |
Ref-2020E30001 | As per e-bid | 2373-/ | As per e-bid | As per e-bid | |
Replacement of water pipelines under offsite area” at NTECL’S VTPP |
NTECL/C&M/OT/CS-4561 | 08.12.2020 | Nill | From 09.12.2020 | 22.12.2020 | |
Bid for All in One Desktop has been published in Gem portal with Gem ID |
GEM/2020/B/896548 | 03.12.2020 | Nill | - | - | |
NTECL/C&M/OT/CS-4522 | 23.11.2020 | Nill | From 23.11.2020 | 10.12.2020 | ||
Single Stage Two Envelope Bidding for Procurement of aluminium sheets |
2000E30210 | 12.11.2020 | 1197/- | 21.11.2020 | 03.12.2020 | |
Corrigendum-2 REPLACEMENT OF 700NB SEA WATER MAKEUP LINE WITH GRP PIPING |
NTECL/C&M/OT/CS-4447 | 19.10.2020 | Nill | From 20.10.2020 | 28.11.2020 | |
Annual Maintenance Contract for Milling system, Fans and APHS at NTECL |
NTECL/C&M/OT/CS-4527 | 16.11.2020 | Nill | From 16.11.2020 | 03.12.2020 | |
NTECL/C&M/OT/CS-4530 | 10.11.2020 | Nill | From 11.11.2020 To 25.11.2020 | 26.11.2020 | ||
NTECL/C&M/OT/CS-4463 | 10.11.2020 | Nill | From 10.11.2020 | 26.11.2020 | ||
Corrigendum-1 REPLACEMENT OF 700NB SEA WATER MAKEUP LINE WITH GRP PIPING |
NTECL/C&M/OT/CS-4447 | 19.10.2020 | Nill | From 20.10.2020 | 19.11.2020 | |
AMC FOR REPAIR AND RECTIFICATION OF MACHINE FOUNDATIONS AND RCC STRUCTURES AT NTECL |
NTECL/C&M/OT/CS-4524 | 21.10.2020 | Nill | From 21.10.2020 | 07.11.2020 | |
2000E30173 | 07.10.2020 | 1,197/- | From 22.10.2020 | 16.11.2020 | ||
CONTRACT FOR REPLACEMENT OF 700NB SEA WATER MAKEUP LINE WITH GRP PIPING |
NTECL/C&M/OT/CS-4447 | 19.10.2020 | Nill | From 20.10.2020 | 07.11.2020 | |
NTECL/C&M/OT/CS-4408 | 10.10.2020 | Nill | From 11.10.2020 | 31.10.2020 | ||
NTECL/C&M/OT/CS-4253 | 29.9.2020 | Nill | From 30.09.2020 | 16.10.2020 | ||
Monorail erection and rectification works in high rise Transfer Points of Bunker areas in CHP |
NTECL/C&M/OT/CS-4389 | 08.10.2020 | Nill | From 08.10.2020 | 24.10.2020 | |
Annual Maintenance contract for Internal & External CHP Electrical |
NTECL/C&M/OT/CS-4510 | 08.10.2020 | Nill | From 08.10.2020 | 26.10.2020 | |
NTECL/C&M/OT/CS-4487 | 19.09.2020 | Nill | From 19.09.2020 | 09.10.2020 | ||
NTECL/C&M/OT/CS-4499 | 19.09.2020 | Nill | From 20.09.2020 | 05.10.2020 | ||
Annual Maintenance Contract for Civil Works at NTECL’s VTPP (Excluding CHP area) |
NTECL/C&M/OT/CS-4497 | 23.09.2020 | Nill | From 23.09.2020 | 07.10.2020 | |
NTECL/C&M/OT/CS-3908 | 11.09.2020 | Nill | From 11.09.2020 | 30.09.2020 | ||
Annual Maintenance Contract for HT/LT Switch gear in Main Plant &offsites |
NTECL/C&M/OT/CS-4451 | 09.09.2020 | Nill | From 09.09.2020 | 29.09.2020 | |
NTECL/C&M/OT/CS-4304 | 02.09.2020 | Nill | From 02.09.2020 | 23.09.2020 | ||
ANNUAL MAINTENANCE CONTRACT FOR TURBINE & AUXILIARIES AT NTECL |
NTECL/C&M/OT/CS-4463 | 29.08.2020 | Nill | From 30.08.2020 | 17.09.2020 | |
NTECL/C&M/OT/CS-4436 | 26.08.2020 | Nill | From 27.08.2020 | 15.09.2020 | ||
ANNUAL MAINTENANCE CONTRACT OF SWITCHYARD DC SYSTEM, DG SET, PROTECTION SYSTEMS & ELECTRICAL TESTING |
NTECL/C&M/OT/CS-4481 | 29.08.2020 | Nill | From 29.08.2020 | 17.09.2020 | |
NTECL/C&M/OT/CS-4411 | 14.07.2020 | - | - | 17.09.2020 | ||
2000E30090 | 13.07.2020 | 2373/- | As per e-bid- | As per e-bid | ||
NTECL/C&M/OT/CS-4439 | 25.07.2020 | - | FROM 25.07.2020- | 10.08.2020 | ||
NTECL/C&M/OT/CS-4411 | 14.07.2020 | - | - | 27.07.2020 | ||
Annual Maintenance Contract for Ash Slurry Disposal Lines and Ash Pond Management of NTECL |
NTECL/C&M/OT/CS-4387 | 21.07.2020 | Nil | FROM 22.07.2020 | 08.08.2020 | |
NTECL/C&M/OT/CS-4353 | 23.05.2020 | Nil | 23.05.2020 | 04.08.2020 | ||
2020_NTECL_50232_1 | 23.04.2020 | NIL | - | 05.08.2020 | ||
2020_NTECL_52827_1 | 25.06.2020 | 1197/- | As per e-bid | As per e-bid | ||
Corrigendum / Procurement of SOx, NOx and CO2 Analyser Along with CAMC |
1900E30366 | 15.07.2020 | 1197/- | As per e-bid | As per e-bid | |
NTECL/C&M/OT/CS-4411 | 14.07.2020 | - | 20.07.2020 | 06.08.2020 | ||
Annual Maintenance Contract for ESP and Fly Ash System of NTECL |
NTECL/C&M/OT/CS-4388 | 16.07.2020 | NIL | 16.07.2020 | 03.08.2020 | |
Corrigendum-2 / Procurement of SOx,NOx and CO2 analyzed along with CAMC |
1900E30366 | 05.06.2020 | 1197 /- | - | 22.07.2020 | |
Corrigendum / Membranes for RO Stage - I in Desalination Plant |
1900E30357 | 16.03.2020 | 1197/- | As per e-bid | As per e-bid | |
NTECL/C&M/OT/CS-4353 | 23.05.2020 | Nil | 23.05.2020 | 21.07.2020 | ||
CONTRACT FOR ESP PLATFORM FABRICATION AND ERECTION FOR ASH HANDLING PIPELINES" at NTECL |
NTECL/C&M/OT/CS-4404 | 07.07.2020 | NIL | 08.07.2020 | 23.07.2020 | |
NTECL/C&M/OT/CS-3690 | 4.07.2020 | 450/- | From 06.07.2020 to 22.07.2020 | 4.08.2020 | ||
NTECL/C&M/OT/CS-4353 | 23.05.2020 | Nil | 23.05.2020 | 14.07.2020 | ||
Corrigendum-1 / Procurement of SOx,NOx and CO2 analyzed along with CAMC |
1900E30366 | 05.06.2020 | 1197 /- | - | 13.07.2020 | |
1900E30357 | 16.03.2020 | 1197/- | As per e-bid | As per e-bid | ||
1900E30357 | 16.03.2020 | 1197/- | As per e-bid | As per e-bid | ||
NTECL/C&M/OT/CS-4353 | 23.05.2020 | Nil | 23.05.2020 | 08.07.2020 | ||
Corrigendum-1 / REPAIR OF PU COATING IN SEA WATER PIPELINES DURING UNIT OVERHAUL |
NTECL/C&M/OT/CS-4256 | 05.03.2020 | Nil | 23.06.2020 | 23.06.2020 | |
Corrigendum-1 / ANNUAL MAINTENANCE CONTRACT FOR ASH DYKE AT NTECL |
NTECL/C&M/OT/CS-4333 | 18.05.2020 | Nil | 25.06.2020 | 25.06.2020 | |
Corrigendum-1 / REPAIR & RECTIFICATION CONTRACT FOR C&I SYSTEMS OF MAIN PLANT & OFFSITE LOCATION |
NTECL/C&M/OT/CS-4338 | 28.04.2020 | Nil | 25.06.2020 | 25.06.2020 | |
Corrigendum-1 / ANNUAL MAINTENANCE CONTRACT FOR LT AND HT MOTORS OF MAIN PLANT AND OFFSITE |
NTECL/C&M/OT/CS-4348 | 23.05.2020 | Nil | 23.04.2020 | 23.04.2020 | |
2020_NTECL_50232_1 | 23.04.2020 | 2373 /- | As per e-bid | As per e-bid | ||
2020_NTECL_49774_1 | 04.06.2020 | 1197 /- | - | - | ||
NTECL/C&M/OT/CS-4271 | 26.05.2020 | Nil | From 26.05.2020 | 09.06.2020 | ||
Supply,Installation & Commissioning Of Screw Chiller Machines As Replacement Of Screw Chiller -1 & 2 |
NTECL/C&M/OT/CS-4353 | 23.05.2020 | Nil | From 23.05.2020 | 10.06.2020 | |
Annual Maintenance Contract LT & HT Motors of Main Plant& Offsites |
NTECL/C&M/OT/CS-4348 | 23.05.2020 | Nil | From 23.05.2020 | 11.06.2020 | |
Corrigendum-1/Repair and replacement of roof & Cladding Sheets at NTECL |
NTECL/C&M/OT/CS-4292 | 22.05.2020 | Nil | From 23.04.2020 | 11.06.2020 | |
Corrigendum-1/Annual Maintenance Contract For ASH DYKE at Ntecl |
NTECL/C&M/OT/CS-4333 | 22.05.2020 | Nil | From 18.05.2020 | 09.06.2020 | |
Corrigendum-4/Deployment of Scissors Lift for Cooling Tower Fills Rectification Work |
NTECL/C&M/OT/CS-4144 | 22.05.2020 | Nil | From 05.03.2020 | 02.06.2020 | |
Waste Management Infrastructure and Other Infrastructure at NTECL |
NTECL/C&M/OT/CS-4334 | 19.05.2020 | Nil | From 21.05.2020 | 11.06.2020 | |
NTECL/C&M/OT/CS-4333 | 18.05.2020 | Nil | From 18.05.2020 | 28.05.2020 | ||
Contract service for dewatering of CW systems during unit overhauling |
NTECL/C&M/OT/CS-4265 | 18.05.2020 | Nil | From 18.05.2020 | 04.06.2020 | |
Annual Jungle Clearance And Monsoon Preparation Works at NTECL |
NTECL/C&M/OT/CS-4258 | 09.05.2020 | Nil | From 11.05.2020 | 28.05.2020 | |
NTECL/C&M/OT/CS-46178-1 | 07.05.2020 | 1,197/- | 10.03.2020 | 25.05.2020 | ||
NTECL/C&M/OT/CS-3752 | 20.03.2020 | Nil | 12.05.2020 | 12.05.2020 | ||
Repair & Rectification contract for C&I Systems of Main Plant & Offsite Locations |
NTECL/C&M/OT/CS-4338 | 29.04.2020 | Nil | From 30.04.2020 | 28.05.2020 | |
Corrigendum / Deployment of Scissors Lift for Cooling Tower Fills Rectification work |
NTECL/C&M/OT/CS-4144 | 29.04.2020 | Nil | From 05.03.2020 | 12.05.2020 | |
Corrigendum / Application/Repair of PU Coating in Sea Water Pipelines During Unit Overhaul |
NTECL/C&M/OT/CS-4256 | 29.04.2020 | Nil | From 05.03.2020 | 14.05.2020 | |
NTECL/C&M/OT/CS-4352 | 27.04.2020 | Nil | From 28.04.2020 | 19.05.2020 | ||
NTECL/C&M/OT/CS-4292 | 23.04.2020 | Nil | From 23.04.2020 | 21.05.2020 | ||
NTECL/C&M/OT/CS-4193 | 2020.04.23 | Nil | From 23.04.2020 | 14.05.2020 | ||
Annual Rate Contract for Rewinding & Repair works of LT motors and Control Transformers of NTECL |
NTECL/C&M/OT/CS-4270 | 2020.03.28 | 1,125/- | 28.03.2020-10.04.2020 | 20.04.2020 | |
Procurement of 0.56 MMT Steam Coal of Orgin other than India for NTECL Vallur TPS |
NTECL/C&M/ICB/CS-4286 | 2020.03.18 | Nil | From 18.03.2020 | 10.04.2020 | |
NTECL/C&M/OT/CS-4298 | 2020.03.12 | NIll | From 12.03.2020 | 26.03.2020 | ||
Annual Maintenance Contract for Civil works in NTECL Township |
NTECL/C&M/OT/CS-4276 | 2020.03.21 | 900 /- | 09.03.2020-18.03.2020 | 25.03.2020 | |
Annual Job Contract for Electrical Maintenance in NTECL Township |
NTECL/C&M/OT/CS-4255 | 2020.03.07 | Nil | From 07.03.2020 | 26.03.2020 | |
Contract for deployment of scissors lift for cooling tower fills rectification work |
NTECL/C&M/OT/CS-4144 | 2020.03.23 | - | From 05.03.2020 | 06.04.2020 | |
Application / Repair of PU coating in sea water pipelines during unit overhaul |
NTECL/C&M/OT/CS-4256 | 2020.03.05 | Nil | From 05.03.2020 | 31.03.2020 | |
Annual Maintenance Contract for Lighting, Hoist & Cranes and Cabling in VTPS |
NTECL/C&M/OT/CS-4185 | 2020.02.06 | 2250 /- | 06.02.2020-24.02.2020 | 06.03.2020 | |
NTECL/C&M/1900E30230 | 2020.01.27 | 1197 /- | Upto 28.02.2020 | 16.03.2020 | ||
NTECL/C&M/OT/CS-3682 | 2020.01.24 | 900 /- | 24.01.2020-06.02.2020 | 17.02.2020 | ||
Annual Maintenance contract for conveyors, equipment & auxiliaries in chp |
NTECL/C&M/OT/CS-4170 | 2020.01.20 | NIL | From 22.01.2020 | 06.02.2020 | |
NTECL/C&M/1900E30217 | 2020.01.10 | 2373 /- | 10.01.2020-25.01.2020 | 07.02.2020 | ||
NTECL/C&M/OT/CS-4206 | 2020.01.08 | NIL | From 08.01.2020 | 18.01.2020 | ||
Compound wall rising, encasing of riser duct & misc. paving works in NTECL |
NTECL/C&M/OT/CS-4034 | 2020.01.01 | 900 /- | 01.01.2020-14.01.2020 | 27.01.2020 | |
Annual Contract for Operation & Maintenance contract for Sewage Treatment Plants in Plant & Township |
NTECL/C&M/OT/CS-4133 | 2019.12.26 | 900 /- | 26.12.2019-08.01.2020 | 17.01.2020 | |
Pre-cast concrete drain trench cover slab and pre- cast concrete pedestals for waste disposal line |
NTECL/C&M/OT/CS-4150 | 2019.12.24 | 900 /- | 24.12.2019-07.01.2020 | 20.01.2019 | |
NTECL/C&M/OT/CS-4134 | 2019.12.20 | 450 /- | 20.12.2019-06.01.2020 | 22.01.2020 | ||
NTECL/C&M/OT/CS – 4036 | 2019.12.17 | 900 /- | 17.12.2019-28.12.2019 | 10.01.2020 | ||
NTECL/C&M/OT/CS-4130 | 2019.12.14 | NIL | 14.12.19-26.12.19 | 09.01.2020 | ||
Supply, Installation, Commissioning and CMC of Online Coal Analyser at NTECL |
NTECL/C&M/ICB/IFB/CS-4160 | 2019.12.13 | 100000 /- | From 17.12.2019 | 16.01.2020 | |
NTECL/C&M/OT/CS-3684 | 2019.11.19 | NIL | 20.11.19-04.12.19 | 17.12.2019 | ||
Maintenance Contract for HT/LT Transformers, Bus ducts & Rectiformers in Main Plant & Offsite areas |
NTECL/C&M/OT/CS-4108 | 2019.11.12 | 1125/- | 12.11.19-24.11.19 | 02.12.2019 | |
Annual Maintenance Contract for milling system, fans and APHS at NTECL |
NTECL/C&M/OT/CS-4102 | 2019.11.11 | 2250 /- | 11.11.19-25.11.19 | 04.12.2019 | |
NTECL/C&M/OT/CS-4095 | 2019.11.07 | 900/- | 07.11.19-23.11.19 | 04.12.2019 | ||
NTECL/C&M/OT/CS-4080 | 2019.11.06 | 2250 /- | 06.11.19-19.11.19 | 02.12.2019 | ||
NTECL/C&M/OT/CS-3969 | 2019.11.06 | 900/- | 06.11.19-16.11.19 | 22.11.2019 | ||
Providing 32 seater AC bus for School going children for two years |
NTECL/C&M/OT/CS-4026 | 2019.10.18 | 1125/- | 18.10.19-04.11.19 | 13.11.2019 | |
NTECL/C&M/OT/CS-3771 | 2019.10.14 | 2250 /- | 14.10.19-26.10.19 | 08.11.2019 | ||
Construction of additional sheds for workers outside the plant premises |
NTECL/C&M/OT/CS-3738 | 2019.09.21 | 2250/- | 21.09.19-05.10.19 | 16.10.2019 | |
NTECL/C&M/1900E30147 | 2019.09.17 | 1197/- | 12.10.19-01.11.19 | 15.11.2019 | ||
NTECL/C&M/1900E30119 | 2019.09.11 | 2363/- | Upto 25.09.2019 | 04.10.2019 | ||
Hiring of 40 ft trailer with Operator for material shifting in CHP for 02 years |
NTECL/C&M/OT/CS-4008 | 2019.09.09 | 1125/- | 09.09.19-22.09.19 | 30.09.2019 | |
Providing, Doors and windows in TP’s at CHP area & NCTPS area |
NTECL/C&M/OT/CS-3556 | 2019.09.05 | 900/- | Upto 19.10.2019 | 25.10.2019 | |
Contract for Replacement of 500NB waste disposal pipeline with GRP piping” at NTECL |
NTECL/C&M/OT/CS-3970 | 2019.09.03 | 900 /- | 03.09.19-18.09.19 | 30.09.2019 | |
NTECL/C&M/OT/CS-4024 | 2019.09.03 | 900/- | Upto 20.09.2019 | 27.09.2019 | ||
NTECL/C&M/OT/CS-3975 | 2019.08.27 | Free of Cost | From 27.08.2019 | 30.09.2019 | ||
Annual Maintenance Contract for Electrical Maintenance of Internal & External CHP |
NTECL/C&M/OT/CS-3916 | 2019.08.20 | 2250/- | 20.08.19-31.08.19 | 13.09.2019 | |
NTECL/C&M/OT/CS-3866 | 2019.08.20 | 1125/- | 07.09.19-16.09.19 | 25.09.2019 | ||
Annual Maintenance Contract for Turbine & Auxiliaries at NTECL,Chennai |
NTECL/C&M/OT/CS-4017 | 2019.08.19 | 2250/- | 19.08.19-28.08.19 | 06.09.2019 | |
NTECL/C&M/OT/CS-3955 | 2019.08.07 | 2250/- | 07.08.19-22.08.19 | 04.09.2019 | ||
Procurement of air radiator (forced air type) cooling system for fluid couplings |
NTECL/C&M/1900E30103 | 2019.08.01 | 1197/- | 07.08.19-21.08.19 | 04.09.2019 | |
NTECL/C&M/1900E30104 | 2019.08.01 | 1197/- | 07.08.19-23.08.19 | 04.09.2019 | ||
Procurement of trolley mounted 60HP dewatering pumps | NTECL/C&M/1900E30080 | 2019.07.03 | 1197/- | 10.07.19-24.07.19 | 05.08.2019 | |
Supply of 3CX150sqmm 33 kv cable for sea water pump house cable rerouting |
NTECL/C&M/1900E30071 | 2019.06.28 | 1197/- | Upto 26.07.2019 | 09.08.2019 | |
NTECL/C&M/ICB/IFB-155/CS-3739 | 2019.06.27 | Free of Cost | Upto 09.07.2019 | 22.07.2019 | ||
Construction of scrap yards in NTECL stores area | NTECL/C&M/OT/CS-3885 | 2019.06.14 | 900/- | 14.06.19-27.06.19 | 12.07.2019 | |
NTECL/C&M/OT/CS-3690 | 2019.06.07 | 450/- | 07.06.19-23.06.19 | 05.07.2019 | ||
Supply, Installation & Commissioning of Online Coal Analyser at NTECL | NTECL/C&M/ICB/IFB/CS-3412 | 2019.05.30 | 1125/- | 30.05.19-12.06.19 | 26.06.2019 | |
NTECL/C&M/1900E30015 | 2019.04.12 | 1197/- | Upto 12.06.2019 | 21.06.2019 | ||
Rate Contract for Rectification work of Fills of Cooling Towers at NTECL | NTECL/C&M/OT/CS-3837 | 2019.05.25 | 1125/- | 25.05.19-01.06.19 | 14.06.2019 | |
Operation and Maintenance of NTECL Grab Unloaders-1&2 at CB-2 of M/s. KPL | NTECL/C&M/OT/CS-3818 | 2019.05.21 | 9000/- | 21.05.19-04.06.19 | 14.06.2019 | |
Laying of OFC at different locations inside NTECL Plant and Laying of Telephone cable & associated work in NTECL Township | NTECL/C&M/OT/CS-3497 | 2019.05.20 | 1125/- | 15.07.19-28.07.19 | 05.08.2019 | |
NTECL/C&M/OT/CS-3826 | 2019.05.17 | 2250/- | 18.05.19-31.05.19 | 21.06.2019 | ||
Annual Job Contract for Electrical Works related to Site Office Maintenance, Construction Power and Miscellaneous Electrical Works | NTECL/C&M/OT/CS-3812 | 2019.05.10 | 1125/- | 10.05.19-22.05.19 | 31.05.2019 | |
Concrete encasing of Ash slurry disposal lines and BA slurry inside the culverts |
NTECL/C&M/OT/CS-3747 | 2019.05.07 | 900/- | 07.05.19-20.05.19 | 05.06.2019 | |
Dust Suppression System for Ash dyke Lagoon-2 | NTECL/C&M/OT/CS-3772 | 2019.04.25 | 2373/- | 25.04.19-15.05.19 | 31.05.2019 | |
Annual Maintenance Contract For Maintenance works in offsite areas (2019-20) at NTECL |
NTECL/C&M/OT/CS-3788 | 2019.04.23 | 1125/- | 23.04.19-02.05.19 | 17.05.2019 | |
Construction of truck bay line in ash dyke Lagoon-2 | NTECL/C&M/OT/CS-3770 | 2019.04.19 | 900/- | 19.04.19-02.05.19 | 13.05.2019 | |
Ground improvement works for Dust extraction system at Crusher house of NTECL’s VTPP |
NTECL/C&M/OT/CS-3807 | 2019.04.17 | 900/- | 17.04.19-29.04.19 | 08.05.2019 | |
Annual Maintenance Contract of Switchyard, DC System, DG Sets, Protection Systems, and Electrical Testing | NTECL/C&M/OT/CS-3763 | 2019.04.17 | 1125/- | 17.04.19-29.04.19 | 10.05.2019 | |
Inspection and rectification of coal bunker conical portions at NTECL |
NTECL/C&M/OT/CS-3798 | 2019.04.17 | 945/- | 17.04.19-10.05.19 | 22.05.2019 | |
Safety related structural works in Conveyors and Transfer points of CHP | NTECL/C&M/OT/CS-3700 | 2019.04.06 | 1125/- | 06.04.19-13.04.19 | 24.04.2019 | |
NTECL/C&M/OT/CS-3776 | 2019.04.06 | 1125/- | 06.04.19-17.04.19 | 03.05.2019 | ||
Installation, Operation & Maintenance of Electric winches for CHP | NTECL/C&M/OT/CS-3579 | 2019.04.03 | 1125/- | 04.04.19-13.04.19 | 26.04.2019 | |
Application / Repair of PU coating in sea water pipelines during unit overhaul |
NTECL/C&M/OT/CS-3777 | 2019.04.03 | 1125/- | 05.04.19-13.04.19 | 29.04.2019 | |
Annual Rate Contract for Rewinding and Repair works of LT motors and control Transformers of NTECL, Vallur | NTECL/C&M/OT/CS-3706 | 2019.04.03 | 1125/- | 03.04.19-13.04.19 | 22.04.2019 | |
Procurement of fabric belt for CHP conveyors | NTECL/C&M/1800E30403 | 2019.03.14 | 2373/- | 25.03.19-16.04.19 | 29.04.2019 | |
Construction of additional sheds for workers outside the plant premises | NTECL/C&M/OT/CS–3738 | 2019.03.09 | 2373/- | 09.03.19-22.03.19 | 03.04.2019 | |
Procurement of conveyor belt coiler / de-coiler machine for CHP |
NTECL/C&M/1800E30396 | 2019.03.08 | 1197/- | Upto 29.04.2019 | 10.05.2019 | |
Supply of 32 NB, Galvanized, ERW Carbon Steel Pipes, Heavy duty as per IS 1161 for Hand Rails |
NTECL/C&M/1800E30393 | 2019.03.05 | 1197/- | Upto 13.04.2019 | 24.04.2019 | |
Annual Job Contract for Electrical Maintenance in NTECL Township |
NTECL/C&M/OT/CS-3745 | 2019.03.01 | 1197/- | 01.03.19-12.03.19 | 22.03.2019 | |
Supply of Ordinary Portland Cement (OPC 43 Grade) as per IS 269/2015, (10000 MT) in 50 Kgs HDPE Bags | NTECL/C&M/1800E30372 | 2019.02.22 | 2373/- | Upto 11.03.2019 | 22.03.2019 | |
NTECL/C&M/OT/CS-3666 | 2019.02.20 | 945/- | 20.02.19-02.03.19 | 13.03.2019 | ||
Contract for Design, Supply, Erection, Commissioning & Test of 25/5T Capacity double grider EOT Crane for Central workshop in NTECL | NTECL/C&M/OT/CS-3691 | 2019.02.14 | 2373/- | 14.02.19-23.02.19 | 15.03.2019 | |
NTECL/C&M/OT/CS-3737 | 2019.02.09 | 945/- | 09.02.19-23.02.19 | 06.03.2019 | ||
Providing, Doors and windows in TP’s at CHP area & NCTPS area | NTECL/C&M/OT/CS-3556 | 2019.02.01 | 945/- | 01.02.19-12.02.19 | 22.02.2019 | |
NTECL/C&M/OT/CS-3686 | 2019.01.21 | 2373/- | 21.01.19-31.01.19 | 11.02.2019 | ||
Annual Maintenance Contract for Civil Works in NTECL Township | NTECL/C&M/OT/CS-3677 | 2019.01.14 | 945/- | 14.01.19-22.01.19 | 01.02.2019 | |
Annual Maintenance Contract for Bunkering Stream Equipments in CHP |
NTECL/C&M/OT/CS-3685 | 2019.01.14 | 2373/- | 14.01.19-21.01.19 | 30.01.2019 | |
Annual Maintenance Contract for Conveyors, Crushers and auxiliary equipments in uploading stream of CHP | NTECL/C&M/OT/CS-3687 | 2019.01.17 | 2373/- | 14.01.19-21.01.19 | 30.01.2019 | |
Supply and application of RTV silicone high voltage insulator coating in 400kv Switchyard |
NTECL/C&M/CS-3492 | 2019.01.09 | 1197/- | 29.01.19-06.02.19 | 20.02.2019 | |
Annual Maintenance Contract for Instrument Air/Plant Air Compressors and Ventilation system of main plant/ESP control rooms | NTECL/C&M/OT/CS-3617 | 2018.12.28 | 483/- | 28.12.18-11.01.19 | 21.01.2019 | |
Annual Maintenance Contract for CHP Lighting Maintenance in VTPP | NTECL/C&M/OT/CS-3433 | 2018.12.04 | 1197/- | 05.12.18-12.12.18 | 21.12.2018 | |
NTECL/C&M/OT/CS-3361 | 2018.11.27 | 2373/- | 28.11.18-11.12.18 | 26.12.2018 | ||
NTECL/C&M/OT/CS-3595 | 2018.11.26 | 945/- | 26.11.18-08.12.18 | 11.12.2018 | ||
Annual Maintenance Contract for CTs and Fire Detection & Protection system at NTECL | NTECL/C&M/OT/CS-3530 | 2018.11.24 | 945/- | 24.11.18-07.12.18 | 10.12.2018 | |
Annual Maintenance Contract for Desalination plant, CW chlorination plant & CPU Regeneration plant at NTECL | NTECL/C&M/CS-3502 | 2018.11.24 | 945/- | 24.11.18-07.12.18 | 12.12.2018 | |
Replacement of corroded structure in BCN 3,BCN 7A/B & BCN 15A/B of CHP |
NTECL/C&M/OT/CS-3562 | 2018.11.21 | 1197/- | 22.11.18-05.12.18 | 14.12.2018 | |
Annual Maintenance Contract for Milling Systems, Fans and APHs at NTECL |
NTECL/C&M/OT/CS-3528 | 2018.10.27 | 2373/- | 27.10.18-12.11.18 | 23.11.2018 | |
Sale of Dry Fly Ash | NTECL/C&M/CS-3582 | 2018.10.24 | See in Tender File | 26.10.18-09.11.18 | 19.11.2018 | |
Rate Contract for Miscellaneous steel fabrication works in Boiler, Turbine, Offsite & AHS and other areas in O&M other than CHP | NTECL/C&M/OT/CS-3560 | 2018.10.23 | 945/- | 23.10.18-05.11.18 | 14.11.2018 | |
Procurement of 0.85 MMT Import Coal of Origin Other Than India for NTECL Vallur TPP |
NTECL/C&M/ICB/IFB-156/CS-3539 | 2018.10.08 | Free of Cost | 09.10.18-19.10.18 | 01.11.2018 | |
Annual Maintenance Contract for LT motors of Main Plant, Offsite and CHP | NTECL/C&M/OT/CS-3483 | 2018.10.08 | 1194/- | 08.10.18-19.10.18 | 26.10.2018 | |
NTECL/C&M/OT/CS-3474 | 2018.10.05 | 1194/- | 06.10.18-17.10.18 | 24.10.2018 | ||
SS Wire Mesh for Cooling Towers | NTECL/C&M/NIT-156/1800E30176 | 2018.08.27 | 1197/- | 15.10.18-31.10.18 | 16.11.2018 | |
NTECL/C&M/NIT-156/1800E30177 | 2018.08.27 | 1197/- | 15.10.18-31.10.18 | 14.11.2018 | ||
NTECL/C&M/NIT-155/CS-3417 | 2018.07.10 | 1197/- | 13.07.18-31.07.18 | 13.08.2018 | ||
Annual Maintenance Contract for Turbine & Auxiliaries | NTECL/C&M/NIT-155/CS-3418 | 2018.07.10 | 2373/- | 12.07.18-30.07.18 | 10.08.2018 | |
Annual Maintenance Contract for HT/LT Switchgear in Main Plant & Offsites |
NTECL/C&M/NIT-155/CS-3414 | 2018.07.10 | 2373/- | 12.07.18-30.07.18 | 10.08.2018 | |
Annual Maintenance Contract for Electrical Maintenance of Internal & External CHP | NTECL/C&M/NIT-155/CS-3390 | 2018.07.10 | 2373/- | 12.07.18-30.07.18 | 13.08.2018 | |
NTECL/C&M/NIT-155/CS-3343 | 2018.07.10 | 945/- | 10.07.18-24.07.18 | 01.08.2018 | ||
Annual Maintenance Contract for Main Plant & Offsite Lighting | NTECL/C&M/NIT-155/CS-3357 | 2018.07.10 | 1197/- | 10.07.18-21.07.18 | 30.07.2018 | |
NTECL/C&M/NIT-155/1800E30086 | 2018.06.08 | 1197/- | Upto 30.07.18 | 13.08.2018 | ||
Supply of Clamp-on Unltrasonic Flow Meters | NTECL/C&M/NIT-155/1800E30112 | 2018.06.28 | 1197/- | Upto 01.08.18 | 17.08.2018 | |
Construction of Concrete Roads & Drains under CSR (Est.Rs. 947.49 Lakhs) |
NTECL/C&M/NIT-154/CS-3367 | 2018.06.01 | 4725/- | 02.06.18-16.06.18 | 27.06.2018 | |
Annual Maintenance Contract for Bottom Ash Handling Systems | NTECL/C&M/NIT-154/CS-3257 | 2018.06.01 | 2400/- | 06.06.18-20.06.18 | 02.07.2018 | |
Annual Maintenance Contract for Ash Slurry Disposal Lines and Ash Pond Management |
NTECL/C&M/NIT-154/CS-3273 | 2018.06.01 | 1200/- | 06.06.18-20.06.18 | 02.07.2018 | |
Annual Maintenance Contract for ESP & Fly Ash Systems at NTECL | NTECL/C&M/NIT-154/CS-3282 | 2018.06.01 | 2400/- | 07.06.18-22.06.18 | 04.07.2018 | |
NTECL/C&M/NIT-154/CS-3394 | 2018.06.01 | 6000/- | 02.06.18-16.06.18 | 25.06.2018 | ||
Miscellaneous Civil Works in Main Plant & Offsite area | NTECL/C&M/NIT-154/CS-3353/td> | 2018.06.01 | 945/- | 05.06.18-19.06.18 | 29.06.2018 | |
NTECL/C&M/NIT-154/1800E30054 | 2018.06.01 | 1182/- | Upto 11.07.18 | 18.07.2018 | ||
Supply of LT Power Cables | NTECL/C&M/NIT-154/1800E30032 | 2018.06.01 | 1182/- | 04.06.18-18.06.18 | 27.06.2018 | |
De-silting of Ponds at villages :(1) Kondakkarai, (2) Pattamandiri and (3) Vallur |
NTECL/C&M/NIT-153/CS-3301 | 2018.03.21 | 2,400/- | 26.03.18-10.04.18 | 20.04.2018 | |
Annual Maintenance contract of Switchyard, DC System, DG Sets, Protection Systems and Electrical Testing | NTECL/C&M/NIT-153/CS-3275 | 2018.03.21 | 1200/- | 22.03.18-13.04.18 | 25.04.2018 | |
NTECL/C&M/NIT-153/CS-3307 | 2018.03.21 | 10,000/- | 21.03.18-09.04.18 | 23.04.2018 | ||
Annual Maintenance Contract for HT Motors of Main Plant, Offsite and CHP areas of NTECL Vallur | NTECL/C&M/NIT-153/CS-3289 | 2018.03.21 | 1200/- | 21.03.18-05.04.18 | 13.04.2018 | |
NTECL/C&M/NIT-153/CS-3128 | 2018.03.21 | 1200/- | 21.03.18-05.04.18 | 16.04.2018 | ||
BCN - 8A / B Corroded structural restoration works | NTECL/C&M/NIT-152/CS-3187 | 2018.01.19 | 4800/- | 20.01.18-06.02.18 | 16.02.2018 | |
Procurement of 0.5 MMT of steam coal of origin other than India for NTECL Vallur TPS |
NTECL/C&M/ICB/IFB-151/CS-3209 | 2018.01.12 | Free of Cost | 12.01.18-10.02.18 | 12.02.2018 | |
Safety related structural work in conveyors and Transfer points of CHP | NTECL/C&M/NIT-150/CS-3156 | 2018.01.04 | 1000/- | 09.01.18-31.01.18 | 19.02.2018 | |
NTECL/C&M/NIT-150/1700E30526 | 2017.12.13 | 4800/- | Upto 25.01.18 | 07.02.2018 | ||
Procurement of steel cord conveyor belt of width 1800mm | NTECL/C&M/NIT-150/1700E30505 | 2017.12.01 | 1200/- | Upto 01.02.18 | 14.02.2018 | |
NTECL/C&M/NIT-150/1700E30545 | 2017.12.23 | 1200/- | Upto 27.01.18 | 02.02.2018 | ||
Annual contract for O&M of stackers & reclaimers of CHP | NTECL/C&M/NIT-149/CS-3142 | 2017.11.29 | 2400/- | 04.12.17-28.12.17 | 19.01.2018 | |
NTECL/C&M/NIT-149/CS-3044 | 2017.11.29 | 1000/- | 04.12.17-28.12.17 | 12.01.2018 | ||
AMC for conveyors, crushers and auxilliary equipments in unloading stream of CHP | NTECL/C&M/NIT-149/CS-3120 | 2017.11.29 | 2400/- | 02.12.17-26.12.17 | 12.01.2018 | |
NTECL/C&M/NIT-149/CS-3128 | 2017.11.29 | 1200/- | 30.11.17-20.12.17 | 08.01.2018 | ||
Transportation of 500 MW Generator Stator & Rotor | NTECL/C&M/NIT-149/CS-3140 | 2017.11.29 | 1200/- | 30.11.17-20.12.17 | 03.01.2018 | |
Supply of OFC Cable (Single mode and Multi mode) for CHP-PLCs & DCS Systems in VTPS |
NTECL/C&M/NIT-149/1700E30482 | 2017.11.29 | 1200/- | Upto 22.12.17 | 03.01.2018 | |
Annual Maintenance Contract for HT motors of Main Plant, Offsite and CHP areas | NTECL/C&M/NIT-149/CS-3144 | 2017.11.29 | 1000/- | 29.11.17-16.12.17 | 27.12.2017 | |
NTECL/C&M/NIT-149/1700E30496 | 2017.11.24 | 1200/- | Upto 27.12.17 | 05.01.2018 | ||
Procurement of 5T capacity diesel engine operated forklift | NTECL/C&M/NIT-149/1700E30474 | 2017.11.15 | 1200/- | Upto 22.12.17 | 03.01.2018 | |
NTECL/C&M/NIT-148/CS-3031 | 2017.10.26 | 950/- | 06.11.17-29.11.17 | 13.12.2017 | ||
Hiring of 50 Seater Non AC bus for School going wards of CISF employees for two years | NTECL/C&M/NIT-148/CS-3079 | 2017.10.26 | 950/- | 31.10.17-18.11.17 | 01.12.2017 | |
Design, Supply, Erection & Commissioning of Dust Extraction system for Crusher House in CHP of NTECL |
NTECL/C&M/NIT-148/CS-3050 | 2017.10.26 | 2400/- | Upto 23.12.17 | 10.01.2018 | |
Inspection and Rectification of conical portion of coal bunkers in NTECL's VTPP | NTECL/C&M/NIT-148/CS-2805 | 2017.10.26 | 950/- | 02.11.17-21.11.17 | 04.12.2017 | |
NTECL/C&M/NIT-148/CS-3051 | 2017.10.26 | 950/- | 02.11.17-25.11.17 | 13.12.2017 | ||
Construction of 8 Nos. Class Rooms at Ulaganatha Narayanaswamy Govt. College, Ponneri | NTECL/C&M/NIT-148/CS-3084 | 2017.10.26 | 2400/- | 04.11.17-28.11.17 | 06.12.2017 | |
Road Repair work at Kondakarai road from TPP road junction to NTECL Plant Main Gate |
NTECL/C&M/NIT-148/CS-3085 | 2017.10.26 | 950/- | 31.10.17-21.11.17 | 06.12.2017 | |
AMC for periodical special assistance in repair of bowl mills, Gravimetric feeder, PF pipes, PF bends, fans and APH at NTECL’s VTPS | NTECL/C&M/NIT-148/CS-3082 | 2017.10.26 | 2400/- | 31.10.17-15.11.17 | 24.11.2017 | |
NTECL/C&M/NIT-147/CS-2969 | 2017.09.21 | 2400/- | 25.09.17-14.10.17 | 25.10.2017 | ||
Supply, Installation, Commissioning & Maintenance of IP based CCTV surveillance system in plant & township of VTPS | NTECL/C&M/NIT-147/CS-2980 | 2017.09.21 | 2400/- | 22.09.17-14.10.17 | 30.10.2017 | |
Fabrication and Erection of platforms for Ash Handling pipelines at NTECL’s VTPP |
NTECL/C&M/NIT-147/CS-2914 | 2017.09.21 | 950/- | 22.09.17-14.10.17 | 27.10.2017 | |
Annual Maintenance Contract for Desalination plant, CW chlorination plant & CPU Regeneration plant | NTECL/C&M/NIT-146/CS-2884 | 2017.08.02 | 950/- | 07.08.17-29.08.17 | 11.09.2017 | |
Annual Maintenance Contract for Internal and External CHP Electrical Maintenance |
NTECL/C&M/NIT-146/CS-2813 | 2017.08.02 | 950/- | 03.08.17-19.08.17 | 30.08.2017 | |
Supply of SF6 gas service cart mounted on a storage tank and SF6 sensor | NTECL/C&M/NIT-146/CS-1700E30260 | 2017.08.02 | 1,200/- | 02.08.17-31.08.17 | 08.09.2017 | |
Annual Maintenance Contract for IDCT Fire Detection & Protection System at NTECL |
NTECL/C&M/NIT-146/CS-2929 | 2017.08.02 | 950/- | 03.08.17-24.08.17 | 01.09.2017 | |
Construction of Safety Centre building at NTECL | NTECL/C&M/NIT-145/CS-2873 | 2017.06.30 | 1,300/- | 06.07.17-26.07.17 | 14.08.2017 | |
NTECL/C&M/NIT-145/CS-2872 | 2017.06.30 | 1,300/- | 07.07.17-27.07.17 | 11.08.2017 | ||
Concrete encasing of structural column & trestle pedestals at NTECL & NCTPS |
NTECL/C&M/NIT-145/CS-2822 | 2017.06.30 | 2,600/- | 05.07.17-26.07.17 | 11.08.2017 | |
Construction of contractor's office shed in main plant area, at NTECL |
NTECL/C&M/NIT-145/CS-2857 | 2017.06.30 | 2,600/- | 03.07.17-24.07.17 | 07.08.2017 | |
Annual job contract for Electrical Maintenance in NTECL Township & SWMUPH LT Systems | NTECL/C&M/NIT-145/CS-2863 | 2017.06.30 | 1,300/- | 03.07.17-24.07.17 | 09.08.2017 | |
Construction of concertina fencing over boundary wall at NTECL, VTTP |
NTECL/C&M/NIT-145/CS-2858 | 2017.06.30 | 2,600/- | 03.07.17-24.07.17 | 09.08.2017 | |
Construction of Gate Complex (Est.Rs.288.53 Lakhs) | NTECL/C&M/NIT-145/CS-2851 | 2017.06.30 | 2,600/- | 03.07.17-24.07.17 | 07.08.2017 | |
NTECL/C&M/NIT-144/CS-2743 | 2017.05.15 | 1,300/- | 24.05.17-16.06.17 | 28.06.2017 | ||
Supply of Cast basalt Pipes for Ash Handling Maintenance | NTECL/C&M/NIT-144/CS-1700E30070 | 2017.05.15 | 2,600/- | 19.05.17-15.06.17 | 21.06.2017 | |
Supply of GI pipe lines for FDPS and Cooling water systems of CHP |
NTECL/C&M/NIT-144/CS-1700E30075 | 2017.05.15 | 1,300/- | 19.05.17-20.06.17 | 30.06.2017 | |
Procurement and erection of colour coated roofing / cladding sheets | NTECL/C&M/NIT-144/CS-2761 | 2017.05.15 | 2,600/- | 19.05.17-10.06.17 | 13.06.2017 | |
NTECL/C&M/NIT-144/CS-2772 | 2017.05.15 | 5,200/- | 20.05.17-10.06.17 | 13.06.2017 |